Hybrid
BESS

DC-coupled solar+battery hybrid energy storage systems combining PCS, MPPT, STS and smart EMS in a single integrated platform. 30 kW to 1 MW with on/off-grid switching within 20 ms. Designed and manufactured by Forte.

Solar+Storage DC-Coupled MPPT STS 30kW – 1MW On/Off-Grid
20ms Grid Switching
Integrated MPPT
Smart EMS
Seamless Backup
Energy Storage Solutions

Solar + battery
hybrid storage

The Forte Hybrid BESS is a fully integrated solar-plus-battery energy storage platform that combines DC-coupled photovoltaic input with lithium iron phosphate (LFP) battery storage in a single system. By integrating the power conversion system (PCS), maximum power point tracking (MPPT), static transfer switch (STS) and energy management system (EMS), the Hybrid BESS eliminates the complexity of separate solar inverter and battery systems.

Seamless on-grid to off-grid transition within 20 milliseconds ensures uninterrupted power supply during grid outages. The integrated MPPT maximizes solar harvest while the STS handles automatic grid switching without operator intervention.

Available from 30 kW for small business and residential microgrids up to 1 MW for large commercial and industrial installations, with parallel configurations supporting even higher capacities.

30kW – 1MW DC-Coupled 20ms Switching MPPT + STS On/Off-Grid
Download Brochure
Forte Hybrid BESS — Solar + Battery Integrated System

Grid Switching

≤ 20 ms
1 MW
Maximum single
unit capacity
≤ 20 ms
On/off-grid
switching time
DC-Coupled
Solar + battery
integration
Product Configurations

Hybrid BESS for Every Application

Three power tiers cover residential microgrids through large-scale commercial and industrial installations, all with parallel expansion capability.

Small Business / Residential

Compact Hybrid

30 kW

Single-unit hybrid inverter for small businesses, residential microgrids and rural electrification. Parallel up to 5 units (150 kW).

  • 30 kW per unit
  • Parallel up to 150 kW (5 units)
  • Integrated MPPT & STS
  • Wall or rack mounting
  • Single-phase / three-phase
Commercial / Industrial

Mid-Range Hybrid

105 / 125 kW

Higher-capacity units for commercial buildings, factories and medium-scale solar+storage projects. Parallel up to 3 units (375 kW).

  • 105 kW or 125 kW per unit
  • Parallel up to 375 kW (3 units)
  • Multi-string MPPT inputs
  • Outdoor-rated enclosure
  • Three-phase grid connection
Large-Scale

Industrial Hybrid

500kW – 1MW

Containerized hybrid systems for large industrial facilities, utility-edge applications and large solar+storage plants.

  • 500 kW to 1 MW per unit
  • Containerized solution
  • MV transformer integration
  • Central EMS & SCADA
  • Turnkey commissioning
Key Features

Why Choose Forte Hybrid BESS

A single integrated platform that replaces separate solar inverters, battery inverters and transfer switches — reducing complexity, cost and installation time.

20ms Grid Switching

Static transfer switch (STS) transitions between on-grid and off-grid modes within 20 milliseconds — fast enough to keep sensitive loads running without interruption during grid faults.

Integrated MPPT

Built-in maximum power point tracking optimizes solar energy harvest across multiple PV strings. DC-coupled architecture eliminates double conversion losses for higher system efficiency.

Smart EMS

Intelligent energy management system coordinates solar generation, battery charge/discharge and grid interaction. Supports time-of-use optimization, self-consumption maximization and peak shaving modes.

DC-Coupled Architecture

Solar PV connects directly to the DC bus alongside the battery — avoiding the AC conversion step. Higher round-trip efficiency, simpler wiring and reduced balance-of-system costs.

LFP Battery Storage

Lithium iron phosphate cells provide safe, long-cycle-life storage with excellent thermal stability. No cobalt, no thermal runaway risk. Over 6,000 charge/discharge cycles at 80% depth of discharge.

Scalable & Parallel

Start with a single unit and expand by paralleling additional units as demand grows. The 30 kW unit supports up to 5 parallel units (150 kW), the 125 kW unit up to 3 (375 kW). Modular growth without replacing existing hardware.

Applications

Where Forte Hybrid BESS Is Deployed

The Hybrid BESS is ideal for any application that combines solar generation with battery storage and requires reliable on/off-grid capability.

Solar Self-Consumption

Maximize use of on-site solar generation. Store excess daytime production for evening and nighttime consumption.

🏡

Residential Microgrids

Energy independence for homes and housing communities. Seamless backup during grid outages with solar+battery.

🏭

Commercial Buildings

Reduce electricity costs through peak shaving and self-consumption. Protect critical loads with automatic backup.

🏯

Industrial Facilities

On-site solar+storage for factories and warehouses. Demand charge reduction and power quality improvement.

🔌

Grid Support

Export stored solar energy during peak grid demand. Participate in demand response programs and feed-in tariffs.

🔋

Backup Power

Critical load protection with sub-20ms switchover. Solar recharges batteries during extended outages for sustained backup.

🌊

Off-Grid & Remote Sites

Complete energy solution for locations without reliable grid connection. Telecom towers, mining camps, rural clinics.

EV Charging Stations

Solar-powered EV charging with battery buffer. Reduce grid demand and provide charging even during outages.

Ready to integrate solar + storage?

Our engineering team will design the optimal Hybrid BESS configuration based on your solar capacity, load profile and backup requirements — at no cost before commitment.

Request a Quote — Hybrid BESS

Our engineering team will contact you within 1 business day. Urgent: +90 850 840 64 24

By submitting this form you agree to be contacted by Forte Teknik A.S. Your data will not be shared with third parties.

Secure · Powered by HubSpot CRM · Response within 1 business day